CASE STUDY

Master’s project Nuevo35

Fachhochschule Dortmund · winter 2024/25 – summer 2025 · Sub-project Powertrain & Simulation

Team members led
6
Operating instructions written
2
Safety briefing participants
15 to 20
Semesters
2

Tools · ProjectLibre · MS Office

01

The project

Master’s project at Fachhochschule Dortmund over two semesters (winter 2024/25 – summer 2025). My sub-project: Powertrain & Simulation.

[What is Nuevo35? Short description of the vehicle and the project goal – to be added by the owner]

Project type
Master’s project
University
Fachhochschule Dortmund
Period
winter 2024/25 – summer 2025
Sub-project
Powertrain & Simulation
Tools
ProjectLibre, MS Office
Vehicle
[describe vehicle]

FIG. 01.01 — Nuevo35

Project
Master’s project Nuevo35
University
Fachhochschule Dortmund
Image source
[to be added]

02

My role

Sub-project lead in the summer semester 2025 for a team of six members in the sub-project Powertrain & Simulation.

6

Team members led · summer semester 2025

[My tasks besides the sub-project lead (winter 2024/25) – to be added by the owner]

03

Team and organisation

How the sub-project was organised:

  • Split the team into two groups: testing and simulation.
  • Created the project plan in ProjectLibre and briefed the team on it.
  • Weekly team meetings and status reports.
  • Interface to the electrics and vehicle electronics teams.
  • Structured the sub-project’s file storage.

FIG. 03.01 — Project plan

Software
ProjectLibre
Groups
Testing, simulation
Status date
[to be added]

04

Commissioning and safety

Wrote the technical documentation for the first commissioning on the roller dynamometer and held the safety briefing together with the safety team.

  • Two operating instructions for the first commissioning on the roller dynamometer.
  • Vehicle readiness checklist.
  • Safety briefing for approx. 15–20 participants, together with the safety team.

15 to 20

Safety briefing participants

FIG. 04.01 — Operating instruction

Document
Operating instruction
Number
2
Purpose
First commissioning on the roller dynamometer

FIG. 04.02 — Vehicle readiness checklist

Document
Vehicle readiness checklist
Purpose
First commissioning on the roller dynamometer

05

Results

What is documented about the sub-project:

Team members led
6
Groups
2 (testing, simulation)
Operating instructions
2
Safety briefing participants
approx. 15–20
Duration
2 semesters (winter 2024/25 – summer 2025)
Result of the first commissioning
[add result]

[Result of the first commissioning and further results of the sub-project – to be added by the owner]

06

What I learned

[What I learned – text to be added by the owner]