CASE STUDY
Master’s project Nuevo35
- Team members led
- 6
- Operating instructions written
- 2
- Safety briefing participants
- 15 to 20
- Semesters
- 2
Tools · ProjectLibre · MS Office
01
The project
Master’s project at Fachhochschule Dortmund over two semesters (winter 2024/25 – summer 2025). My sub-project: Powertrain & Simulation.
[What is Nuevo35? Short description of the vehicle and the project goal – to be added by the owner]
- Project type
- Master’s project
- University
- Fachhochschule Dortmund
- Period
- winter 2024/25 – summer 2025
- Sub-project
- Powertrain & Simulation
- Tools
- ProjectLibre, MS Office
- Vehicle
- [describe vehicle]
FIG. 01.01 — Nuevo35
- Project
- Master’s project Nuevo35
- University
- Fachhochschule Dortmund
- Image source
- [to be added]
02
My role
Sub-project lead in the summer semester 2025 for a team of six members in the sub-project Powertrain & Simulation.
6
Team members led · summer semester 2025
[My tasks besides the sub-project lead (winter 2024/25) – to be added by the owner]
03
Team and organisation
How the sub-project was organised:
- Split the team into two groups: testing and simulation.
- Created the project plan in ProjectLibre and briefed the team on it.
- Weekly team meetings and status reports.
- Interface to the electrics and vehicle electronics teams.
- Structured the sub-project’s file storage.
FIG. 03.01 — Project plan
- Software
- ProjectLibre
- Groups
- Testing, simulation
- Status date
- [to be added]
04
Commissioning and safety
Wrote the technical documentation for the first commissioning on the roller dynamometer and held the safety briefing together with the safety team.
- Two operating instructions for the first commissioning on the roller dynamometer.
- Vehicle readiness checklist.
- Safety briefing for approx. 15–20 participants, together with the safety team.
15 to 20
Safety briefing participants
FIG. 04.01 — Operating instruction
- Document
- Operating instruction
- Number
- 2
- Purpose
- First commissioning on the roller dynamometer
FIG. 04.02 — Vehicle readiness checklist
- Document
- Vehicle readiness checklist
- Purpose
- First commissioning on the roller dynamometer
05
Results
What is documented about the sub-project:
- Team members led
- 6
- Groups
- 2 (testing, simulation)
- Operating instructions
- 2
- Safety briefing participants
- approx. 15–20
- Duration
- 2 semesters (winter 2024/25 – summer 2025)
- Result of the first commissioning
- [add result]
[Result of the first commissioning and further results of the sub-project – to be added by the owner]
06
What I learned
[What I learned – text to be added by the owner]